We are convinced that a holistic assessment of the protection goals is essential

Consultation and concept development in fire protection

Every building and every property has specific characteristics. Certain structural conditions are created by the planners. The resultant individual requirements for fire protection arise from this.

For an effective and extinguishing system concept that will pass the acceptance procedure, a holistic consideration of the protective goals is required, taking into account the architectural conditions. Facts and objectives must be harmonized by a fire protection expert.

Example of an assessment of the existing situation: Hall/building floor plan with entries for planing the sprinkler system

Analysis is the first step in fire protection

  • First, a risk and hazard analysis is prepared as an essential basis for further action.
  • Subsequently, the problem is identified by an independent risk manager and the interpretation of the insurer’s so-called risk protocol.
  • The assessment in terms of building regulations, through the preparation of a fire protection concept or expert fire protection report must also be taken into account.
  • In this way we arrive at a realistic cost estimate for the fire protection requirements.

Sprinkler group layout plan after the conversion of the existing situation and the retrofitting of the sprinkler system

We find solutions: Construction site sketch of a sprinkler low point drain for drying systems to collect antifreeze and condensate

We will get to the bottom of the fire protection for your property.

The B+H company principle of “Specialisation & Cooperation” produces target-oriented, individually tailored fire protection solutions – for warehouses, factory buildings, sawmills, assembly halls, logistics centres, public buildings and much more.